NHA awards contract for construction of CPEC’s M-8 Motorway

0
874

Islamabad, JUN 14 /DNA/ – The National Highway Authority (NHA) on Monday awarded an Rs 8 billion contract for the construction of 168 kilometres long-missing link in the M-8 Motorway of the central alignment of the China-Pakistan Economic Corridor (CPEC) initiative.
According to a Gwadar Pro’ s report on Tuesday, 250 kilometres Ratodero-Khuzdar and 193 kilometres Gwadar-Hoshab sections of the M-8 Motorway are operational. Similarly, work on 146 kilometres long Hoshab-Awaran section is also underway at a cost of Rs9.12 billion. 
The contract for the last missing link between Awaran and Naal (near Khuzdar) has been awarded to a joint venture of Habib Construction Services and Matracon Pakistan for Rs 8.08 billion.
After completion of this section, Islamabad, Peshawar and Lahore will be connected with the Gwadar Port through the shortest route, NHA said. It will also mark the completion of the first-ever access-controlled link between the Gwadar Port and northern parts of the country.
The M-8 Motorway starts from Ratodero in Sindh and culminates at the Gwadar Port, passing from Khuzdar, Awaran, Hoshab and Turbat areas of Balochistan.
The east-west motorway will link Sukkur, Sindh with Gwadar. Pakistan has already completed a network of access-controlled roads from Peshawar and Islamabad up to Sukkur.